HOME | SITE BACKGROUND | BOTANY TRANSFORMATION PROJECTS | COMMUNITY INVOLVEMENT | CONTACT US

Project Home Page

Background
History
Project Overview

NCUA & Orica's Response

Strategy Review 07-08


Cleaning Up the Groundwater

Groundwater Treatment Plant (GTP)

Backup System

Hydraulic Containment

Contaminant (DNAPL) Investigations


Community Matters

Calendar
Community Liaison Committee (CLC)

CLC Meeting Documents
Outreach Programs
Residential Bore Monitoring

Rainwater Tank Rebate
Community Air Monitoring
Community Workshops

 

Independent Monitoring Committee

Introduction
Members
Activities

Reports

 

Publications

CLC Newsletters updated
Fact Sheets

Reports

Progress Reports

Archive

Independent Validation Audit
Environmental Monitoring

Ecological Monitoring

Community Air Monitoring

Site Air Emission Sampling 

Settlement Monitoring

Other Monitoring
Human Health Risk Assessment

Further Groundwater Investigations

Conceptual Site Model

DNAPL Investigations

Extremities Investigations
Bioremediation Research

GTP Environmental Impact Statement

Groundwater Cleanup Plan & NCUA

 

Generic Public Documents

SH&E Management Plan

Conceptual Site Model Report

A Conceptual Site Model (CSM) was developed for the Botany Groundwater Cleanup Project, and other current contamination projects at Botany Industrial Park (BIP). The objective of the CSM is to summarise and encapsulate pertinent information derived from the many studies undertaken at BIP and surrounding areas, including:

  • the history of industrial activity and land development at BIP and surrounding properties, including potentially contaminating activities and land uses;
  • the progression and scope of investigation and remedial works undertaken by Orica and its predecessor ICIA associated with the Botany Groundwater Cleanup Project;
  • the environmental setting at BIP and surrounding affected properties;
  • the inferred sources, nature and extent of contamination, including the various media affected by the contamination;
  • the mechanisms for transport and attenuation of the contaminants, and exposure of identified receptors to the contamination;
  • the potential health and environmental risks which the identified contamination is inferred to pose; and
  • effects of current remedial practices, and the results of previous remediation work and trials.

Since the main contamination migration and exposure issues associated with the BIP are related to groundwater, the CSM is primarily a hydrogeological document. However, as indicated above, summary data and relevant information are also included for soil, surface water, sediment, biota and vapour phase contamination.

 

Conceptual Site Model - Botany - 23 Nov 07 pdficon_small.gif Size
Main Report 899 KB
Figures  
  Figure 2.1: Site Location 834 KB
  Figure 2.2: Subdivision/Ownership of BIP and Plant Locations 1.5 MB
  Figure 2.3: Surrounding Land Use 203 KB
  Figure 2.4: Bundled Piezometer, Monitoring and Extraction Well Locations 1.1 MB
  Figure 2.5: Historical Excavation and Drainage Features - Southlands 164 KB
  Figure 3.1: Local Area Surface Topography 305 KB
  Figure 3.2: Aerial Extent of Botany Basin 183 KB
  Figure 3.3: Contours Showing Elevation of Bedrock Surface 425 KB
  Figure 3.4: Locations of Geological Cross Sections 107 KB
  Figure 3.5: Geological Cross Section A - A', BIP Line - 1st Street 749 KB
  Figure 3.6: Geological Cross Section B - B', BIP Line - 2nd Street 496 KB
  Figure 3.7: Geological Cross Section C - C', PCA Line 800 KB
  Figure 3.8: Geological Cross Section D - D', SCA Line 604 KB
  Figure 3.9: Geological Cross Section E - E' 207 KB
  Figure 3.10: Geological Cross Section F - F' 222 KB
  Figure 3.11: Geological Cross Section G - G' 213 KB
  Figure 3.12: Distribution of K Values: Layer 1 110 KB
  Figure 3.13: Distribution of K Values: Layer 2a 114 KB
  Figure 3.14: Distribution of K Values: Layer 2b 114 KB
  Figure 3.15: Distribution of K Values: Layer 2c 115 KB
  Figure 3.16: Shallow Aquifer Water Table Elevation Contours Pre-GTP Extraction (Oct 04) 550 KB
  Figure 3.17: Deep Aquifer Potentiometric Head Elevation Contours Pre-GTP Extraction (Oct 04) 551 KB
  Figure 3.18: Shallow Aquifer Water Table Elevation Contours Under GTP Extraction (Jun 07) 365 KB
  Figure 3.19: Deep Aquifer Potentiometric Head Elevation Under GTP Extraction (Jun 07) 368 KB
  Figure 3.20A: Hydraulic Cross Section A-A', BIP Line, 1st Street (Jun 07) 848 KB
  Figure 3.20B: Hydraulic Cross Section B-B', BIP Line, 2nd Street (Jun 07) 538 KB
  Figure 3.21: Hydraulic Cross Section C-C', PCA Line (Jun 07) 863 KB
  Figure 3.22: Hydraulic Cross Section D-D', SCA Line (Jun 07) 698 KB
  Figure 4.1: DNAPL Sources, Inferred Source Areas and Plume Axes (Pre-Hydraulic Containment) 211 KB
  Figure 4.2: Inferred Distribution of CHCs - Central Plume Source Area (H-H') - 2005 812 KB
  Figure 4.3: Total Percentage Solubility of CHCs - S2 and S3 Source Areas (I-I') - 2005 563 KB
  Figure 4.4: Total Percentage Solubility of CHCs - S1 Source Areas (J-J') - 2005 405 KB
  Figure 4.5: Distribution of 1.2-Dichloroethane (EDC) - Deep Aquifer - Sep 2006 297 KB
  Figure 4.6: Distribution of Tetrachloroethene (PCE) - Deep Aquifer - Sep 2006 235 KB
  Figure 4.7: Distribution of Trichloroethene (TCE) - Deep Aquifer - Sep 2006 234 KB
  Figure 4.8: Distribution of Vinyl Chloride (VC) - Deep Aquifer - Sep 2006 244 KB
  Figure 4.9: Distribution of Tetrachloride (CTC) - Deep Aquifer - Sep 2006 241 KB
  Figure 4.10: Distribution of Chloroform (CFM) - Deep Aquifer - Sep 2006 230 KB
  Figure 4.11A: Geochemical Cross Section A-A' - BIP 1st Street Hydraulic Containment Line - June 2005 2 MB
  Figure 4.11B: Geochemical Cross Section B-B' - BIP 2nd Street Hydraulic Containment Line - June 2005 1.2 MB
  Figure 4.12: Geochemical Cross Section C-C' - PCA Hydraulic Containment Line - June 2005 3.5 MB
  Figure 4.13A: Geochemical Cross Section E-E', September 2006 330 KB
  Figure 4.13B: Geochemical Cross Section E-E', September 2006 334 KB
  Figure 4.14A: Geochemical Cross Section F-F', September 2006 405 KB
  Figure 4.14B: Geochemical Cross Section F-F', September 2006 408 KB
  Figure 4.15A: Geochemical Cross Section D-D' - SCA Hydraulic Containment Line - September 2005 846 KB
  Figure 4.15B: Geochemical Cross Section D-D' - SCA Hydraulic Containment Line - September 2005 863 KB
  Figure 4.15C: Geochemical Cross Section D-D' - SCA Hydraulic Containment Line - September 2005 850 KB
  Figure 4.15D: Geochemical Cross Section D-D' - SCA Hydraulic Containment Line - September 2005 855 KB
  Figure 4.16: Dissolved Mercury Concentrations - Layer 1, May 2007 639 KB
  Figure 4.17: Dissolved Mercury Concentrations - Layer 2A/2B, May 2007 631 KB
  Figure 4.18: Dissolved Mercury Concentrations - Layer 2C/3, May 2007 646 KB
  Figure 4.19: Groundwater pH - Layer 1, May 2007 633 KB
  Figure 4.20: Groundwater pH - Layer 2A/2B, May 2007 666 KB
  Figure 4.21: Groundwater Electrical Conductivity - Layer 2A/2B, May 2007 667 KB
  Figure 4.22: Groundwater Electrical Conductivity - Layer 2C/3, May 2007 672 KB
  Figure 4.23: Post GTP Startup Aquifer Zones 322 KB
  Figure 4.24: Distribution of Tetrachloroethene and Trichloroethene - Intertidal Discharge Zone - Penrhyn Estuary - March 2007 276 KB
  Figure 4.25: Distribution of 1,2-Dichloroethane and Vinyl Chloride - Intertidal Discharge Zone - Penrhyn Estuary - March 2007 279 KB
  Figure 4.26: Distribution of Chloroform - Intertidal Discharge Zone - Penrhyn Estuary - March 2007 194 KB
  Figure 6.1: Location of PSRIB 1.6 MB
  Figure 6.2: Location of Bioremediation Trials 498 KB
  Figure 6.3: Location of GTP Pipelines 189 KB
  Figure 6.4: Layout of GTP 639 KB
  Figure 6.5: Location of Settlement Plates 1.1 MB
  Figure 6.6: Layout of DNAPL Thermal Treatment Field Trial 36 KB
  Figure 7.1: Conceptual Hydrogeochemical Cross Section - Pre-Pumping Conditions 372 KB
  Figure 7.2: Conceptual Hydrogeochemical Cross Section - Pumping Conditions 416 KB
Appendices  

A

Historical BIP Plant Locations

247 KB

B

Historical Products Manufactured at BIP 56 KB

C

Industrial History of BIP 68 KB

D

Industrial History of Area Surrounding BIP 488 KB

E

Notice of Clean Up Actions (Consolidated) 354 KB

F

Areas of Restricted Groundwater Usage in Botany Basin 797 KB

G

Selected Figures from Stage 1 Investigation 213 KB

H

Selected Figures from Stage 2 Investigation 1.2 MB

I

Selected Figures from Stage 3 Investigation 786 KB

J

Licensed Bore Locations in model Area 614 KB

K

Water levels Near BIP: 1960s and 1980 499 KB 

L

Historical Interaction between Springvale Drain and Shallow Groundwater 201 KB

M

Predicted Water Table and Potentiometric Head Contours during Pumping 145 KB

N

Conceptual Model of DNAPL Behaviour 513 KB

O

Properties of Chemical and Waste Process Streams, and DNAPLs 176 KB

P

Pipe Plots 518 KB

Q

CHC Transformation Pathways 125 KB

 

 Last updated: Tue Aug 10 12:42:22 2010